South Bank Bus Shelter

Tempe, Arizona

800 sq/ft


As part of the overall design of South Bank, Circle West worked with the City of Tempe transit department to incorporate a rapid transit stop along the south side of the project. The transit stop structure has been designed to incorporate sustainable materials and solar powered lighting

Facebook Twitter YouTube Pintrest LinkedIn